Command Centre
πŸ‘ Viewing as
● Synced Β· Sun Jul 26
Sunday
πŸ”΄ Open Weekend β€” quiet. Monday opens with Weekly Sync (9am) and the Marillac resync (2:30pm)  Β·  Top of the pile: MIX revisions β€” Delia.mov got 9 more comments Fri Jul 24; Cassio now on it  Β·  Bryan Blue shot Friday β€” footage to ingest + assign an editor

Daily Brief β€” Sun Jul 26

Auto-selected from live data
Active Projects
Stage Pre-Production Production Post-Production Stale / on hold Right chip = urgency/status.

🎬 Frame.io Activity β€” MAIN OMG

Needs Action

This Week
Recommendations
01
Lock Friday's shoot at today's 10am prep: get Goran's RSVP on record, confirm final call time, gear, and the 9:30am departure. Shoot is tomorrow.
02
Assign the MIX mentor revisions today: Audrey's 9 comments have sat overnight with no editor β€” the cheapest client-facing win on the board is going stale.
03
Kitchener Golf is the last blocker on Ashbury: its main video is at client-review stage β€” once Eric is free, he moves to the Ashbury hero cut within 1–2 days.
04
Confirm Biomiq's real status: monday has it Completed, but the Jul 20 discovery meeting says otherwise β€” reconcile before it slips through a crack.
05
Prep the August pipeline: IG Wealth golf shoot (~Aug 10) and MyStoria (late-July) both need dates and crew locked while post is heavy.
All Projects
Recently Delivered
ProjectClientStatus
CorLibra demo videoCorLibraFinalized
Vena Medical Device UseVena MedicalFinalized
monday Reconciled against the OMG Project Management board (In Progress group); the ~55 Completed items are excluded. Other. and EFM are now included β€” EFM is mostly Darren & Tiffany, so it has light inbox coverage. Biomiq's "Completed" label is stale β€” a SOW was drafted Jul 23, so it's kept active.
Calendar Today + next 7 days Β· today highlighted
Note Daily standup runs 9:15am. Weekly sync is Mondays. The Marillac Place resync (Mon 2:30pm) is tracked as an on-hold project below.
Frame.io Activity MAIN OMG Β· last 3 weeks

🎬 Review Activity

πŸ”΄ Open 9 comments from Audrey O'Hara (July 22) across Joseph, Guen and Christie are still awaiting a turn from Post-Production. No new Frame.io activity has come through since. Note: Able's ALTA review sits on a separate Frame project, not MAIN OMG.
My Tags
Workload who's editing and coordinating what Β· active projects only

Onward Assistant

Full project context loaded